Data moved without anyone
taking it on faith.

We migrate data into Salesforce, and between Salesforce orgs, with a signed mapping workbook, loads that can be re-run safely, reconciliation at every load and a rollback plan. Our engineers moved about 75,000 records between orgs with zero failures. Migrations are fixed price, from $15,000 to $75,000 and up.

Data migration, in short.

What it isMoving records, and their history where it matters, into Salesforce or between Salesforce orgs
SourcesOther Salesforce orgs, spreadsheets and databases, and exports from other CRMs and case-management systems
Price$15,000 – $75,000+, fixed price. Pricing
What you getA signed mapping workbook, a reconciliation pack for every load, a cutover runbook and a rollback plan
ProofAbout 75,000 records migrated between Salesforce orgs with zero failures. Case study

How does a migration run?

  1. Access and inventory. Every system holding data is listed, and exports, backups and API access are requested in the first week. Source access often sets the schedule: some vendors charge for exports and take weeks to deliver them.
  2. Profile before designing. Fill rates, distinct values and date ranges for every field. Scope agreed in writing: which records, how much history, and where out-of-scope data goes.
  3. The mapping workbook. Field-by-field mapping, value translations, numbered transform rules, duplicate rules, and a log of everything deliberately left behind, with who approved it. Signed off by you.
  4. Loads that can be re-run. Every record carries its source ID in an external-ID field and loads by upsert, so any load can be repeated without creating duplicates.
  5. Test loads in a sandbox. A hand-picked sample of awkward records first, then full volume to time it, then a dress rehearsal of the cutover.
  6. Reconciliation. Counts for every object, per-record checks on key fields and amounts, referential checks, and a review of real records by your own people, side by side with the old system.
  7. Cutover. A freeze or a delta load, automation paused during the load and re-enabled in order, and a go/no-go before anyone starts working in the new system.
  8. Rollback. The old system stays intact until you sign off, and every loaded record is tagged by batch so a load can be purged cleanly.

What changes when you move between Salesforce orgs?

Record IDs change

We carry each source ID into an external-ID field on the target and resolve every lookup through it, so relationships survive the move.

Created dates and owners

Audit fields can be set only when a record is inserted, and only with a specific permission. Records owned by people who have left need another. Both are planned before the first load.

History doesn’t move as history

Field history can’t be recreated as history rows. We export it to an archive object or a file so it stays available.

Automation doesn’t travel with data

Flows, Apex, validation and sharing rules are deployed as metadata, and switched off or bypassed during loads so they don’t fire on migrated records.

The API allocation is shared

Loads draw on the same daily API allocation as your users and integrations, so we schedule them around working hours.

Documents may live elsewhere

Files stored outside Salesforce, such as Litify’s Docrio, move through their own API as a separate pipeline with its own checks.

Nothing goes live on data
nobody has checked.

Moving the records is the easy part. Projects lose credibility on mapping, duplicates, automation firing mid-load and validation nobody signed off. That is where the effort goes, and it is what the price covers.

How are duplicates handled?

Before the load, not after. Matching rules are set per record type, with three outcomes: merge automatically above a high threshold, send to a person in a review band, keep separate below it. Every merge is logged, and you review a sample before the load runs.

The rules guard against false merges: family members with the same name, organisations sharing a switchboard number, placeholder values like “Unknown”. Merging inside Salesforce after the load fires automation and loses the trail back to the source, so we don’t.

Migrations our engineers have shipped.

About 75,000 records between Salesforce orgs

Zero failures, with a process that could be rehearsed, verified and reversed. Case study

A 32% mislink rate, cut to zero

Proof that record links are checked, not assumed. Case study

Delivered by our engineers and anonymised. How we attribute this work.

Where this applies.

The platform work is the same across industries. These pages cover what differs.

Related: implementation · org rescue · pricing

Common questions.

How much does a Salesforce data migration cost?

$15,000 to $75,000 and up, fixed price. The range depends on the number of objects, the volume and condition of the data, and how easily the source systems give it up.

How long does a migration take?

It depends most on source access. We request exports and credentials in the first week, because some vendors take weeks to deliver a full export. The schedule is set once the inventory is done.

Can we keep working during the migration?

Yes, until the cutoff. After that, either the old system is frozen for the cutover window or only changed records move at the end. The dress rehearsal tells us which fits.

What happens to records we don’t migrate?

That is agreed in writing before mapping starts: a read-only archive, continued read-only access to the old system, or an export you keep. Check your record-retention obligations before excluding anything.

Tell us where it’s getting stuck.

Describe the system you are trying to build, or the one that stopped keeping up. We will follow up with a call and, if it is a fit, a scope and a timeline.